Supply of 15 laptops and anti-virus software inclusive of setting up of business.
General supply of stationery and office equipment (2022)
YALELO
Performed fiber optic Wide Area Network supply of all network peripherals and installations, splicing and termination at Yalelo Fish Farm in Siavonga. We planted poles as well as interconnecting uplinks for various building.
DELTA EDGE LIMITED (2023)
Supply of 10 Cisco routers (4321) and 8 Cisco switches (2960).
Supply of 1.2 KM of single mode fiber optic.
Supply of 20,000 of CAT 6E ethernet cable.
NCHIFAR ENTERPRISES
Construction of underground and overhead ZTE Optic-Zesco Metrophase 1 Chililabombwe town project (2019).
Construction of 33KV Underground 240 MM2 Cable from Bird Cage to Kafue Roundabout (2018).
Fiber Optic construction for ZAMREN/SMARTNET (2017).
LUSAKA TELECOMS
From Lusaka to Livingstone Phase 1 Fibre Optic Installation for Airtel Phase 1 (Mazabuka - Monze and Lusaka - Chilanga) Project (2021).
Second Phase 125 KM Airtel/MTN roll out project from Kabompo to Zambezi (2022).
Third Phase 25 KM Airtel/MTN roll out project for Lumezi and Vwaza National Park (2022).
Installation of overhead and underground Fiber for home affairs VSS Camera installation in most parts of the Copperbelt (Ndola, Luanshya, Mpongwe and Sakanya Border project valued at (2021).
Supply of Fiber Optic accessories (2020).
E-LOGIC GROUP OF COMPANIES
Supply of 8,000 KM Fiber Optic Cables.
Supply of 500 Bedsheets.
Supply of 250 comfort blankets.
Supply of 1,000 Patch Cords and Pigtails.
Supply of building materials, computers and stationery.
SMARTNET ZAMBIA LIMITED (FROM 2022 TO DATE)
4 years running contract for the installation and maintenance of the Fiber Optic installations.
HAMMS (2023)
Supply, installation and maintenance of power backup solutions: Inverters, Maximum Power Point Tracker (MPPT) Devices and Solar Batteries.
LAN hardware and software and fiber optic premises and long-haul installations, and general construction works.